Purbachal Proposed New Town
Purbachal is a more biggest area than other city in
Bangladesh.All aristocratic people are liking this area for living.Most of the
Government officers and most elite personals booked Purbachal new town
plots.Here is building of schools,college,university,Mosque,Play
ground,Swimming pool etc.
It is the biggest Planned township in the country . the
Project area comprise of about 6150 acres land located in between the
shitalakhya and the balu River at Rupgonj thana of Narayangonj District and at
Kaligonj Thana of Gazipur District ,In the north-eastern side of Dhaka . The
Township will be linked with 8(eight) lane wide express way from the Airport
Road/Pragati swarani crossing . The distance is only 6.8 km. There will be
provision of about 26,000 residential plots of different sizes, 62,000
apartments with all necessary infrastructure and urban facilities. RAJUK
intends to plan and develop the area as self-contained .New Township with all
modern facilities and opportunities .38.74% land used for Residential ,25.9%
for Road ,6.41% for Administrative and Commercial ,3.2% for Institution and
Industrial Park ,6.6% for urban Green and Open spaces , 7.1% for Lakes and
canals ,2.5% for sports, 6% for Education, Health and Social Infrastructure.
Location of the Project
Location of the Project
"Purbachal New Town Project" is situated at Rupgonj Thana of Narayangonj District and Kaligonj Thana of Gazipur District in between river balu and sitalakhya at a distance of 16 KM from zero point of Dhaka. The project implementation period is July, 1995 to June, 2012. The total area of the Project is 6150 acres which is divided into 30 sectors. Out of which development works are going on in 4500 acres (Narayangonj part).
To reduce the pressure of population in Dhaka city by creating
opportunity of residential accommodation of the city dwellers in the vicinity
of the city.
To maintain the balance of environment by proper Urbanization. To create
environment friendly and sustainable atmosphere.
To reduce the existing acute problem of housing.
To expand civic facilities by urbanization to the near by and
surrounding areas gradually.
Development of new township and to expand economic facilities.
Background
Dhaka Metropolitan city has now been
turned into the busiest & densely populated city. Lakhs of people reside
permanently in Dhaka city, the capital of Bangladesh for service, business and
other purpose. The dwelling places required for the large number of people are
quite very inadequate. As a result, the residential areas of Dhaka city are
turning into overcrowded dirty localities day by day and creating unhealthy
environment.
It is possible to reduce the pressure of population of Dhaka city to a great extent by developing the surrounding area of Dhaka city in a planned way and establishing permanent residential accommodation for these vast population.
It is possible to reduce the pressure of population of Dhaka city to a great extent by developing the surrounding area of Dhaka city in a planned way and establishing permanent residential accommodation for these vast population.
Present Position of the Project
[Proposed]:
Site development: Site development works of sector 1-5, 11 to 14 & 17
have nearly been completed. For other sectors the site development works are
progressing smoothly.Estimate for site development at Gazipur part has been
completed and tendering for execution is under process.
Construction of Road: Road construction works in sector no 1 to 5, 11, 13, 14 & 17 have nearly been completed. For other sectors the road construction works are ongoing.
Construction of Bridges: At 1st phase 7 no.s of bridge Construction work are ongoing and shall be completed by December/2011. At 2nd phase 4 no.s of bridge Construction work are ongoing and shall be completed by June/2012.Rest of the bridges are in the process of tendering.
Construction of 300'-0" wide 'purbachal Link Road':
- Road embankment Construction work is complete.
- Pavement works will be started by August/2011 and shall be completed by January/2013.
Construction of Kuril Flyover: Construction work of Kuril Fly-over has been started .Structure construction progress is 30%. Overall progress is 20%.It is expected to be completed by April/2012.
Utility services: Necessary actions are being taken for establishing of utility services viz Electricity, Gas, Water supply, Sewerage and Telecommunication etc . through the connection authority .
Plot handing Over: The handing over of Plots in the sectors 4, 5 and 17 has started on March/2011. Handing over of plot in the sectors 3,11,12,13 and 14 is expected to be started from December/2011.
Construction of Road: Road construction works in sector no 1 to 5, 11, 13, 14 & 17 have nearly been completed. For other sectors the road construction works are ongoing.
Construction of Bridges: At 1st phase 7 no.s of bridge Construction work are ongoing and shall be completed by December/2011. At 2nd phase 4 no.s of bridge Construction work are ongoing and shall be completed by June/2012.Rest of the bridges are in the process of tendering.
Construction of 300'-0" wide 'purbachal Link Road':
- Road embankment Construction work is complete.
- Pavement works will be started by August/2011 and shall be completed by January/2013.
Construction of Kuril Flyover: Construction work of Kuril Fly-over has been started .Structure construction progress is 30%. Overall progress is 20%.It is expected to be completed by April/2012.
Utility services: Necessary actions are being taken for establishing of utility services viz Electricity, Gas, Water supply, Sewerage and Telecommunication etc . through the connection authority .
Plot handing Over: The handing over of Plots in the sectors 4, 5 and 17 has started on March/2011. Handing over of plot in the sectors 3,11,12,13 and 14 is expected to be started from December/2011.